BOQ Review · KSA

BOQ review that exposes the gap before it becomes claim, delay, or cost.

A disciplined reconciliation between drawings, specifications, and quantities so the tender package says exactly what the project means.

Independent BOQ review for consultants, contractors, developers, and project teams in Saudi Arabia. The objective is simple but critical: every measurable item should connect clearly to the drawings and specifications, with missing scope, duplication, vague descriptions, and unit inconsistencies surfaced before pricing or procurement begins to magnify them.

What's included

  • Line-by-line BOQ checking against architectural drawings and package references
  • Reconciliation of BOQ wording with specifications and drawing notes
  • Identification of missing items, duplicated quantities, and incorrect units of measure
  • Flagging of vague descriptions that create pricing ambiguity and tender risk
  • Structured discrepancy register with severity and recommended corrective direction
  • Optional post-review support to help teams answer tender clarifications consistently

Who it's for

  • Consultants issuing tender packages and wanting an independent technical review.
  • Contractors checking quantities and scope logic before pricing exposure increases.
  • Developers verifying whether the package they received is commercially and technically sound.
  • Project managers reconciling variation risk against an original baseline.

Deliverables

EngagementUsually delivered as a fixed-scope review with turnaround tied to package size, complexity, and urgency.

  • Annotated BOQ file
  • Discrepancy register
  • Reconciliation summary report
  • Quantity check sheets
  • Recommended wording / correction notes
  • Review call walkthrough

How I work

  1. 01

    Receive the package

    Review the drawing set, specification book, and BOQ version being issued so the analysis is tied to the correct baseline.

  2. 02

    Cross-check systematically

    Read each BOQ line against drawings, details, notes, and specification intent with no assumption-based shortcuts.

  3. 03

    Log the findings

    Record every issue with enough clarity to act on it: where it appears, why it matters, and what should be corrected.

  4. 04

    Issue the reconciliation

    Deliver an annotated report that helps the team clean the package before tender, negotiation, or award.