Industrial Development
Plant 2 — Planning, approval, and visual articulation
Official Approval
This industrial food facility is built on planning clarity before anything else: mass distribution, service movement, production-line alignment, and reading MODON requirements as a design framework rather than an approval checkbox.
- → Location
- Jeddah Industrial City 1
- → Type
- Industrial Food Facility
- → Approval
- MODON — Approved
- → Consultant
- MABS Adv. Tech. Engineers

Project views
Production massing, façade, and administrative arrival



Land Utility
Share- Total Lot Area
- ~38,400 m²
- 100%
- Total Built Area
- ~27,500 m²
- ~72%
- Production Building
- ~14,300 m²
- ~52%
- Storage / Hangar
- ~11,500 m²
- ~42%
- Setbacks & Asphalt Roads
- ~9,300 m²
- ~24%
- Building Height
- ~13.4 m
- —
Case Study
Overview
A MODON-approved food production facility in Jeddah Industrial City 1, developed to align operational logic with regulatory clarity and clean architectural expression.
Key Contributions
- ·Coordinated the master layout against MODON requirements
- ·Analysed setbacks, land use, and occupancy ratios
- ·Developed architectural views for the facility, façade, and admin arrival
- ·Aligned the package with European suppliers and production lines
- ·Prepared materials supporting both technical review and approval flow
Outcome / Value
A clearer industrial package with approved layout logic and a stronger connection between production planning, operational access, and architectural presence.
- Role
- Architect — layout coordination, approval support, and visualization
- Scope
- Site planning, land-use analysis, production and service mass coordination, supplier alignment, and review-ready presentation material.
Next engagement
If your project needs design intelligence and delivery discipline, let's talk.
Available for selected Saudi engagements covering design coordination, BOQ review, tender packages, and delivery support from concept to technical issue.